Annual Maintenance Contract

Inspection Areas Inspection intervals
General performance of the whole equipment prior to start activities 3 months
Visual Inspection for wear & condition of the rope securing element 3 months
Visual inspection for the functioning of the hook block parts like sheaves, safety catch, wear of hook, free movement of hook etc. 3 months
Visual inspection for wear & smooth functioning of top block pulleys and its mounting accessories. 6 months
Inspection for tightness/conditions of end carriage connection bolts 12 months
Visual inspection for wear and damage of trolley wheels, sprockets, guide rollers. 6 months
Check the tightness/condition of trolley cross bar shaft. 12 months
Visual inspection for the condition/wear of LT rail 12 months
Visual inspection for condition of LT wheels, bearings, flanges etc. 12 months
Overhaul inspection of hoist gearbox for any abnormal sound, oil leakage etc. topping up the oil level if required. 3 months
Overhaul inspection of CT/LT gear box for abnormal sound, oil leakage etc. topping up the oil level if required. 3 months
Visual inspection for correct functioning of wire rope drum and abnormal wear of rope drum shell. 6 months
Visual inspection, cleaning, lubrication with wire rope spay and record the dia. and condition of the wire rope. 3 months
Visual inspection/correction for the firmness/correct functioning of crab power supply system. 6 months
Visual inspection/correction for the correct functioning of hoist limit switch as per customer requirement. 3 months
Visual inspection/correction for correct functioning CT/LT limit switches. 3 months
Visual inspection/correction for the correct functioning of pendant control station and pendant control cables. 3 months
Visual inspection/tightness of electrical connections of control panels. 3 months
Visual inspection/tightness of electrical connection of motor terminal boxes. 6 months
Visual inspection/tightness of electrical connections of all junction boxes. 6 months
Visual inspection/correct functioning of overload system if test load available. 12 months